Day 11 - Friday, January 17, 2020 - Build Day 7
Friday, January 17, 2020
Objectives:
- Continue bumper assembly
- Continue shooter prototype
- Do more shooter tests and try at different voltages
Description:
Dario worked on testing the prototype shooter. Recorded slow mo videos of the shooter to see flex and compression. We were not able to get the variable voltage to work. It was limited at 5 amps and we need more than that.
Images/Sketches/Videos:
Action Items:
- Attach conveyor system to shooter test.
- Continue bumper assembly.